Blog

SUNY Albany Center for Environmental

Sciences & Technology Management The 75,000 square foot CESTM building houses a research facility, laboratories, offices, conference rooms, and an incubator industrial space. The facility includes the Atmospheric Sciences Research Centers, the NY Center for Advanced Thin Film Technology (CAT), and the National Weather Service regional forecast office. The building consists of two different wings, connected with an impressive three-story entrance rotunda and 120 foot high tower.

Aug 11, 2018 / by admin / Comments are off for this post

Union Graduate College

Construction Cost $5,200,000Size 24,000 sfSpecial Distinctions Soil Abatement Geothermal Heating/Cooling Start Date December 2007 Completion Date September 2009 The Union Graduate College’s new facility is a LEED Certified building that has united the schools of the college in one location for the first time in its history. Built on an old gas station site, the project experienced problems from the very start. MLB was faced with an unusual amount of contamination in the soils which delayed the project for more than a month. Once the soil was removed, the project proceeded with great efficiency. The three-story, 24,000 square-foot structure is…

Aug 11, 2018 / by admin / Comments are off for this post

University of Tampa

Riverside Building MLB was chosen from a large group of contractors to replace the store front of the University of Tampa’s Riverside Building. The complexity of this job was the timing. MLB needed to guarantee that the day-to-day use continued for the campus throughout the construction duration. MLB coordinated extensive electrical and concrete work during the project and was able to turn the building over to the University at the scheduled time.

Aug 11, 2018 / by admin / Comments are off for this post

North Carolina Central Univeristy

Biomedical/Biotechnology Research Institute This facility is an innovative research and training institute dedicated to the advancement of fundamental knowledge of human diseases. The facility provides 11 state-of-the-art research laboratories, a modern animal facility, computing and visualization laboratories, an auditorium, and 30 offices. The building was constructed with over 10,000 square feet of aluminum panels and glazing, 2,000 cubic yards of concrete and 250 tons of steel.

Aug 11, 2018 / by admin / Comments are off for this post

SUNY Adirondack

Wilton Center A 32,500 square foot facility which includes 14 classrooms, state-of-the-art interdisciplinary laboratory, 75 seat lecture hall, and geothermal HVAC system. The exterior façade features a natural stone veneer with glass accents to establish continuity with the neighborhood’s appearance. This two-story building tripled the size of the existing SUNY Adirondack Wilton Campus, which has seen a significant increase in enrollment since the grand opening.

Aug 11, 2018 / by admin / Comments are off for this post

Skidmore College Arthur Zankel Music Center – Saratoga Springs, NY

Arthur Zankel Music Center Referred to as the hub of music activity on campus, the Arthur Zankel Music Center cost approximately $30 million to construct. The building consists of three wings, each with a separate foundation, a 600-seat concert hall, faculty offices, individual practice rooms, a 100-seat lecture hall, electronic music laboratory, piano lab, a below-stage pit elevator, and a soaring glass wall with open views to the college’s South Park. Designed with sustainability in mind, the building incorporated geothermal heating/cooling into its design and the building’s angular shape helps to minimize its footprint on the land.   Watch Video:…

Aug 11, 2018 / by admin / Comments are off for this post

Saratoga Springs City Center, NY

Construction Cost Contract value = $6,876,503 Completed value = $7,023,431Size 32,000 sfProject Schedule Award Date = September 2009 Completion Date = June 2011 MLB Construction Services, LLC was chosen as the General Contractor for the renovation of the Saratoga City Center. MLB was the original contractor who built the Center back in 1985 and was excited about the opportunity to provide a much needed facelift. The $16 million dollar construction project began on Sept. 14, 2009, but, it has been a ten year process since the initial conception and planning. The project added 12,000 square feet to the remodeled building,…

Aug 11, 2018 / by admin / Comments are off for this post

Greenwich Regional Medical Center

This 23,500 square foot medical office building was constructed on a vacant site and has been a great addition to the Glens Falls Hospital. The building includes a Family Practice Clinic, Physical Therapy, Specialty Physicians, and an Imaging Suite. Its traditional clapboard siding and gabled roof design gives the building its character and helps it blend into its surrounding environment.

Aug 11, 2018 / by admin / Comments are off for this post

Mile Lake Village

MLB completely renovated the exterior of the Mile Lake Village condominiums at the Harbour Ridge Yacht and Country Club in Palm City, Florida. The project, which features twenty condo units in five buildings, each received new windows, stucco, paint, brick pavers, architectural steel stairs and railings. There will also be renovations on the bike barn, cart barn, pool house and pool patio.

Aug 11, 2018 / by admin / Comments are off for this post

Walmart

MLB Construction Services, LLC is a preferred contractor for the world’s largest retailer, Walmart Stores, Inc. MLB has built or renovated Walmart stores up and down the east coast and the jobs have ranged from new supermarket construction to complete open-store remodels, which require round-the-clock supervision and stringent safety and quality control monitoring to ensure timely completion and unencumbered operations for the duration of the project.

Aug 11, 2018 / by admin / Comments are off for this post