Site work and new construction of a Stewarts Shop with a service station.
This project was a renovation of approximately 5,580 square feet in the first-floor sports therapy area (rooms 120A – 130A) of the Wendell Murphy Football Center of NCSU. Modifications included: demolishing existing offices and an outdated wave pool, and installing a steam room and hot and cold therapy pools in the 1,805 gross square foot hydrotherapy area. Also included were updated offices, open cubicles, a reconfigured central therapy area, finishes, plumbing, mechanical and electrical systems.
Construction Cost Final Amount = $10,500,000 Size: 54,400 sf Contract Date: August 2015 Completion Date: May 2016 Surfside is located in the heart of the Lake George Village surrounded by breathtaking views of both the radiant lake and scenic mountains. The brand new four-story structure is comprised of 50 luxury guest suites with a full custom underground parking garage built exclusively for the Surfside Hotel and guests. Despite restricted budget, schedule, and winter conditions, MLB was able to fast track this 54,400 square foot hotel completed within the time allotted by the Owner and come in under budget. Coordination between…
Construction Cost $7,400,000Size 57,000 sfStart Date June 2002Completion Date August 2004 Two grand old masonry and timber student residence halls constructed in the early 1800’s and subsequently subjected to numerous renovations were the candidates of this total gut renovation and restoration project. Each of the 28,500 square-foot buildings received considerable structural attention; new mechanical, electrical, and plumbing systems; new elevators; and new bedrooms, bathrooms, classrooms and social spaces. Accessibility was an important consideration and was maintained throughout the duration of the project. In addition to the interior renovations, the stucco exterior was carefully reconditioned as well.
Construction Cost $4,867,913Start Date March 2009Completion Date December 2009 When The College of Saint Rose decided to transform its former Music Center into the Center for Communications and Interactive Media (CCIM), MLB was chosen as Construction Manager for this fast paced, high profile project. CCIM is a technologically advanced multimedia home for the college’s distinguished communications and music industry programs. The 20,000 square foot facility, located in the southwest corner of the Saint Rose campus, now houses new TV and internet radio studios, a live performance recording studio, viewing room, multimedia computer labs and faculty offices.
Construction Cost Contract value= $3,826,111 Completed value = $3,619,252Size 57,150 sfAward Date May 2016 MLB completed a state of the art 57,000 sqft covered tennis facility in Cary, NC that provides players with seven posttension, concrete tennis courts covered for year-round play. Faced with the daunting task of closing 25% of the existing park while constructing the new building, MLB worked with all shareholders to ensure a seamless transition of allowing the full time use of the park while being under construction. Massive grading and redesign of the existing utilities on the project were just a few of the design…