Skidmore College Arthur Zankel Music Center – Saratoga Springs, NY

Arthur Zankel Music Center Referred to as the hub of music activity on campus, the Arthur Zankel Music Center cost approximately $30 million to construct. The building consists of three wings, each with a separate foundation, a 600-seat concert hall, faculty offices, individual practice rooms, a 100-seat lecture hall, electronic music laboratory, piano lab, a below-stage pit elevator, and a soaring glass wall with open views to the college’s South Park. Designed with sustainability in mind, the building incorporated geothermal heating/cooling into its design and the building’s angular shape helps to minimize its footprint on the land.   Watch Video:…

Aug 11, 2018 / by admin / Comments are off for this post

Saratoga Springs City Center, NY

Construction Cost Contract value = $6,876,503 Completed value = $7,023,431Size 32,000 sfProject Schedule Award Date = September 2009 Completion Date = June 2011 MLB Construction Services, LLC was chosen as the General Contractor for the renovation of the Saratoga City Center. MLB was the original contractor who built the Center back in 1985 and was excited about the opportunity to provide a much needed facelift. The $16 million dollar construction project began on Sept. 14, 2009, but, it has been a ten year process since the initial conception and planning. The project added 12,000 square feet to the remodeled building,…

Aug 11, 2018 / by admin / Comments are off for this post

Skidmore College Murray Aitkens Dining Hall – Saratoga Springs, NY

Total Construction Cost: Final Contract Value = $8,300,000 Project Schedule: Project Start = September 2005 Completion Date = August 2006 As Construction Manager, MLB orchestrated the development of a carefully planned, three phase approach to this fast-tracked project. The mid-Winter Holiday break provided the ideal opportunity to accomplish selective demolition, re-enforce steel columns and get footings in place for the addition of second floor meeting and banquet rooms as well as a 4,000 square foot atrium which provides attractive entry and social space, the Atrium Café, and convenience store. The core kitchen, server and dining spaces were kept intact for…

Aug 11, 2018 / by admin / Comments are off for this post