Blog

Rensselaer Polytechnic Institute – Freshman Commons Dining Hall

The RPI Commons Dining Hall project was a Design-Build addition and expansion for Sodexo. The roughly 5,000 square foot addition was built onto Commons to house new dining concepts and add more seating for students. New dining areas include a demonstration kitchen, MYCook kitchen, bakery, expanded pizza and pasta options, new deli and salad bar counters, and a new grill area. The basement and first floor were renovated to house RPI’s catering operations and to enhance their ability to serve the campus community.

Sep 11, 2019 / by admin / Comments are off for this post

NCSU Murphy Football Center Sports Medicine

This project was a renovation of approximately 5,580 square feet in the first-floor sports therapy area (rooms 120A – 130A) of the Wendell Murphy Football Center of NCSU.  Modifications included: demolishing existing offices and an outdated wave pool, and installing a steam room and hot and cold therapy pools in the 1,805 gross square foot hydrotherapy area.  Also included were updated offices, open cubicles, a reconfigured central therapy area, finishes, plumbing, mechanical and electrical systems.

Sep 02, 2019 / by admin / Comments are off for this post

RPI/Sodexo – Panera Bread

Oct 24, 2018 / by admin / Comments are off for this post

Siena College – Digital Campus Sign

Oct 24, 2018 / by admin / Comments are off for this post

Skidmore College-Center for Integrated Sciences (Phase1a)

Construction Start Date May 2018 MLB Construction was the Construction Manager on the Enabling Package for The Center for Integrated Sciences project and is now in the midst of construction on Phase 1a of CIS for Skidmore College. CIS is the single largest academic initiative in Skidmore’s history. The 200,000-square-foot Center for Integrated Sciences will put 10 Skidmore science departments and programs under a single roof in order to foster dialogue between and among scientific disciplines, the humanities, arts and social sciences. The science facility will house 46 research labs, as well as the IdeaLab, a creative maker space for…

Oct 24, 2018 / by admin / Comments are off for this post

WorkSource Bldg K, Goldsboro, NC

Oct 24, 2018 / by admin / Comments are off for this post

RPI – North and E

Construction Cost Final Amount = $3MSize 39,000 sfContract Date June 2016Completion Date August 2016 After sitting unoccupied for three full years, Rensselaer Polytechnic Institute needed to come up with a solution to house their increasingly large incoming freshman class. RPI engaged MLB to manage the rapid renovation and restoration of the school’s North and E Complex Dormitories that provide additional living spaces for over 150 students.With less than a three month window to completion, asbestos removal was one of the larger challenges eating up a month of the project schedule. The North Complex, consisting of 20,000 square feet, gained a…

Oct 13, 2018 / by admin / Comments are off for this post

SUNY Plattsburgh Clinton Dining Hall Renovation

Construction Cost Contract Value = $6,622,400Size 22,000 sfContract Date February 2017 Completion Date Phase 1: August 2017 Phase 2: January 2018 The complete renovation of the SUNY Plattsburgh Clinton Dining Hall included all kitchen, dining area, and restroom facilities. This project was scheduled into three phases: May 2017—August 2017 included the dining space. September 2017—January 2018 included the restroom and lobby spaces. May 2018—August 2018 included all of the preparation areas, loading dock space, and kitchen areas. This contract included all new kitchen equipment, dining room millwork, upgrades to all finishes, and new HVAC, plumbing and electrical systems throughout. All…

Oct 13, 2018 / by admin / Comments are off for this post

SUNY Albany Center for Environmental

Sciences & Technology Management The 75,000 square foot CESTM building houses a research facility, laboratories, offices, conference rooms, and an incubator industrial space. The facility includes the Atmospheric Sciences Research Centers, the NY Center for Advanced Thin Film Technology (CAT), and the National Weather Service regional forecast office. The building consists of two different wings, connected with an impressive three-story entrance rotunda and 120 foot high tower.

Aug 11, 2018 / by admin / Comments are off for this post

Union Graduate College

Construction Cost $5,200,000Size 24,000 sfSpecial Distinctions Soil Abatement Geothermal Heating/Cooling Start Date December 2007 Completion Date September 2009 The Union Graduate College’s new facility is a LEED Certified building that has united the schools of the college in one location for the first time in its history. Built on an old gas station site, the project experienced problems from the very start. MLB was faced with an unusual amount of contamination in the soils which delayed the project for more than a month. Once the soil was removed, the project proceeded with great efficiency. The three-story, 24,000 square-foot structure is…

Aug 11, 2018 / by admin / Comments are off for this post