Murray-Aikins Dining
Hall
> Back to Education
Photo by Stockstudiosphotography.com
Renovation and expansion of a College Dining Hall is
no easy task, especially when it is the campus’ primary food
preparation and service facility, and operations must be maintained
throughout the year.
As Construction Manager, MLB orchestrated the development
of a carefully planned, three-phase approach to this fast-tracked
project. The mid-Winter Holiday break provided the ideal opportunity
to accomplish selective demolition, re-enforce existing concrete
columns and install footings for the addition of second floor meeting
and banquet rooms as well as a 4,000 square foot atrium which provides
attractive entry and social space, the Atrium Café, and convenience
store. The core kitchen, servery and dining spaces were kept
intact for the Spring Semester.
At the conclusion of the academic year, the forty year-old
facility was totally gutted and refitted with entirely new freezers,
coolers, kitchen and dishwashing spaces and mechanical systems. Multiple
new food stations, each featuring specialized cuisine choices, and
restaurant-style seating were put in place to create an attractive,
welcoming and comfortable environment where students and staff dine,
study, and socialize. The introduction of natural lighting
and a Geothermal heating and cooling system add to the efficiency
of this state-of-the-art campus dining facility which was ready to
resume full operation for the Fall Semester.
| Fast Facts |
| Location |
Saratoga Springs,
New York |
| Owner |
Skidmore College |
| Contact |
Larry Krison
(518) 580-5870 |
| Architect |
Connor Architecture |
| Contact |
Mark Connor
(781) 643-0018 |
| Size |
40,000
square feet |
| Cost |
$8.3 million |
| Duration |
8 months |
|